Back to listing

Full details for 2 Bedroom Apartment For Sale in Chingford, Highams Park

Photos

1/6
Property photo 1
2/6
Property photo 2
3/6
Property photo 3
4/6
Property photo 4
5/6
Property photo 5
6/6
Property photo 6

Description

PRE-LAUNCH VIEWINGS NOW AVAILBLE. PLEASE CALL US TO ARRANGE AN APPOINTMENT.
The Courtland proudly introduces carefully considered lateral apartments that have been meticulously designed to provide the best in modern living. Style and character create the best in free-flowing living spaces, with elegant design touches, architectural flourishes and high-grade finishes.

Comprising of 8 spacious two and three-bedroom apartments, perfectly located close to beautiful Epping Forest, yet within easy reach of the bustle of town. The Courtland offers a truly superb place to call home. Here, you are within the desirable Golden Triangle of North Chingford, Buckhurst Hill, and Woodford, where high street stores, luxury boutiques and chic restaurants make everyday life a real pleasure, while the transport links into London are also within an easy reach.

An eclectic choice of global cuisine awaits with a range of caf© and restaurants creating a vibrant buzz to wine and dine, including the renowned Sheesh restaurant, third generation family favourite Bel-Sit Pizzeria and the ever-popular Gails Bakery for top-class coffee and cakes.

For leisure: King George Sailing Club, The Connaught Club and local golf courses including West Essex and Woodford lies adjacent to the vast open spaces of Epping Forest. The forest, which lies just a short walk from The Courtland, forms a green link between London and Essex and is home to wildlife, nature reserves, walks and sites of historic interest.

The Courtland is situated within the vicinity of some of the area‘s best state and private schools alike, namely Bancroft‘s and Trinity School as well as Beechoak Farm Montessori Pre-School to name a few.

Note
All apartments will benefit from a long Leasehold. Prices may very at time of launch. All images are computer generated images. The development is currently in the final phase with completion estimated for January 2025.

Back to listing
arrow