Back to listing

Full details for Other For Sale in East Hampton, New York

Photos

1/37
Property photo 1
2/37
Property photo 2
3/37
Property photo 3
4/37
Property photo 4
5/37
Property photo 5
6/37
Property photo 6
7/37
Property photo 7
8/37
Property photo 8
9/37
Property photo 9
10/37
Property photo 10
11/37
Property photo 11
12/37
Property photo 12
13/37
Property photo 13
14/37
Property photo 14
15/37
Property photo 15
16/37
Property photo 16
17/37
Property photo 17
18/37
Property photo 18
19/37
Property photo 19
20/37
Property photo 20
21/37
Property photo 21
22/37
Property photo 22
23/37
Property photo 23
24/37
Property photo 24
25/37
Property photo 25
26/37
Property photo 26
27/37
Property photo 27
28/37
Property photo 28
29/37
Property photo 29
30/37
Property photo 30
31/37
Property photo 31
32/37
Property photo 32
33/37
Property photo 33
34/37
Property photo 34
35/37
Property photo 35
36/37
Property photo 36
37/37
Property photo 37

Description

105-107 Newtown Lane (the "Property") is prime, mixed-use asset. The Property is one of the largest commercial, mixed-use buildings in East Hampton. It includes three street-level commercial units, eight 1 bedroom rented residential apartments, and a separate 4-bedroom, 4-bathroom rental house. The property is fully leased. The property is 9,342 SF (0.21 acres) with 10,900 SF of Gross Floor Area in the main building plus a 3,000 SF of basement space. This 10,900 SF is split roughly into 6,800 SF of residential space and 4,100 SF of commercial space. In addition, the 1150 sf of garage space may be converted to dry retail. The Property has an excellent location on one of East Hampton's main high streets - Newtown Lane. The site is located on Newtown Lane and the corner of Railroad Avenue. It's within short walking distance of Main Street in the Village of East Hampton. East Hampton's train way station is located diagonally opposite the property. This location has driven absorption such that there has not been a vacancy in a decade. There are no un-utilised development rights available today however in 2-4 years, the town will install a sewer system which will allow for more density throughout town. Thereafter, we believe additional development opportunities will materialize at that time. Back to listing
arrow